My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP09733
DRMS
>
Back File Migration
>
Report
>
REP09733
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:39:16 PM
Creation date
11/27/2007 12:14:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980110
IBM Index Class Name
Report
Doc Date
10/1/1993
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` , iii iiiiiiiiniiiiii <br />~^.'' ~ Notice of Intent to Continue Mining Operations ~~~tl~/EC <br />112 Annual Report <br />Permittee Name: Colorado Sand & Gravel Company ~~ T ~ 1 199 <br />Permit No: M-80-110 rr.,,,,y <br />Operation Name: Henderson Dev nc'1r~rnEr,;s~; <br />Anniversary Date: 09/09/93 V~'~•pY <br />Total: $550.00 (Due on your Anniversary Date) <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? <br />Does this mine operate MORE or LE55 than 180 days per year? MORE LESS <br />2a. Financial Warranty: $9Z,370.~ 2b. Permitted acreage: 7.15 <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* 13.7 <br />5. Total acres reclaimed for the report year:* +~, ~ <br />6. Total acres in various stages of reclamation:* <br />a. Backfilled: ~4 d. Topsoil replaced: 33.3 <br />b. Graded: 33:3 Average topsoil thickness <br />replaced: (o inc.he5 <br />c. Seeded: 3~;z, <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:' flofl tKPlI <br />8 <br />9. <br />* Please show the location of the acreage for items <br />Indicate the phases of the reclamation which have been <br />your timetable. <br />** NQIE: If there have not been any changes since the <br />previously submitted a map which correctly depicts the <br />through 6, then a new map is unnecessary. However, yo <br />4 - 6 on your map**. <br />completed, correlated with <br />last annual report and you <br />current acreage in items 2 <br />~ must state this fact above <br />Signature: ~~{~j ~~~ Date: 9~~/ J <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: Kape(r B,~LIr~/7 Phone: (~03 >~-Z'~-Z~ <br />Company: t-1~.(r. CL~(K'~• I~C.tl.erlG~Sr ~nC. <br />Address: 3!~ S.'~j~N~ 1-3- `ViI, #.JDO f%V,Q,~OX~~~~J <br />LUk2V~lClt'~, ~(~ , ~Z35 ~1~der, [p, goZll) <br />i/ <br />Federal Tax ID No. ~^~Ll'-~~~ '~• ^'^ D~-04~~-~-3'~ 3 <br />JJJI""t7l <br />Estimated total acres to be affected in the next report year:* ~, O <br />
The URL can be used to link to this page
Your browser does not support the video tag.