Laserfiche WebLink
<br />• <br />January 20, 1989 <br />~I I I I~ I II ~ I~ ~~~~'I~ <br />sss <br />Mined Land Reclamation Division <br />State of Colorado <br />215 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado. 80203-2273 <br />• <br />VALCO, INC. <br />GUNNISON CONCRETE DIVISION <br />P.O. BOX 837 <br />GUNNISON, COLORADO 81230 <br />(303) 641-0951 <br />~f~ f;tiq ~® <br />.JAN ? 5 1989 <br />REGLA~~ATby DIVISiptu <br />RE: Annual Report & Fee for Permit #M-77-023 Valco, Inc. Gunnison <br />Please accept this as our Annual Report for the above named permit <br />for the mining period of January 23, 1988 thru January 23, 1989. <br />A check for $350 for the Annual Fee is enclosed. <br />1. Mining occured in the northeast portion of Tract A, <br />Phase One, on the east half of the property. This <br />is the same area as mined in 1987-88 only we mined <br />deeper. Approximately 2.25 acres were mined. (Map) <br />2. No acres were reclaimed. <br />3. No acres are in various stages of reclamation because <br />we are still mining in this phase. <br />4. No new vegetation was planted. <br />5. No fertilizer or soil conditioners were used. <br />6. Mining is continuing in this phase and the only <br />reclamation that has occured is the vegetation of <br />the top soil piles. <br />7. We estimate we will mine about 3 acres more or less in <br />this same area of Phase One in 1989-90 depending upon <br />business demand. <br />8. The effective date of this information is January 20, 1989. <br />George R. Greg <br />General Manager <br />Encls: Map & Check <br />ROCKY FORD PUEBLO CANON CITY LAMAR CRESTED BUTTE <br />