Laserfiche WebLink
<br /> <br /> <br />STATUS OF MWING AND RD3~AAIATION <br />Pit Name: East Rigden Operator: Flatiron Materials Co. <br />Manager: Dave Edel <br />Date: July 22, 1982 Reporting Period: 8/1/81-8/1/82 <br />A. Please provide a brief narrative of your reclamation efforts in the past 12 mcnths <br />Specifically we are interested in what you have and have not aco~lished in this <br />area and an explanation of the problems inwlved and the successful methods you've <br />used. <br />This past year we leveled the spoil around the dewatering trenches, <br />about 3,5 acres, backfilled about 3 acres and topsoiled about 6 acres. <br />The backfilled acres will be topsoiled next year, <br />B. In order to supply detail for your evaluation, please fill in the blanks below. , <br />3 <br />I. Mining Permit Annual Report <br />Actual Specification Projection <br />a. ~ Acres Stripped <br />Locations y <br />b. $ Acres Excavated <br />Locations 0 <br />c. ~ Acres available for <br />reclamation <br />Locations 3 <br />