Laserfiche WebLink
. III IIIIIIIIIIIIIIII <br />July 31, 1998 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RECEIVED <br />AUG 3 ~ <br />DIV. OF MINERALS <br />8 GEOLOGY <br />Re: Hattle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-28-112, TR-010 <br />weekly Pond Compliance Report <br />July 26 - Au st O1, 1998 <br />Dear Mr. Dillie: <br />Attached is a summary of the on-site cyanide analysis performed on <br />samples from the tailings pond and the collection pond during the week <br />of July 26 - August O1, 1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.0111 ppm CN-wad and 0-749 <br />ppm CN-total. The collection pond averaged 0.013 ppm CN-wad and 0.048 <br />ppm CN-total. <br />Sir~,cerely, <br />Ron Zumwalt <br />cc: Bill Lyle <br />Dan Robertson <br />