My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP09619
DRMS
>
Back File Migration
>
Report
>
REP09619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:39:12 PM
Creation date
11/27/2007 12:11:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977193
IBM Index Class Name
Report
Doc Date
1/6/2000
Doc Name
ANNUAL REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
il'V <br />ANNUAL REPOR'1[' <br />INSTRUCTIONS <br />IIC <br />Acrxrrtlin~ to C'.R.S. 343?-1 16(3), and C.R.S. 34-3?,i-I 16(31(x), on the anniversary date of the permit each year. <br />the ope:mtor shall submit a rep,rrt and a map showing the extent of current disturbances to aflecced land, <br />reclamation accomplished ur date and during the preceding year. new disturbances that are anticipated to oc~_ur <br />during the upcoming; year, and reclamation that will be performed dmin~ the upamting dear. Please attach such <br />a report and map to enclosed annual report form. (An adeyuately labeled map that cle~3rly delineates and includes <br />the above elements may suffioe fur a u'ri[ten report.) <br />If your operation is ~.ubjeet to the provisions of Temporary Cessation as defined in the Act and Pules, you must <br />provide with the Annual Report the following information as required by .' CCk 407-1, 4(17-4, and Rules <br />I.]i.7i U(ai: <br />(I) the condition of the operar:on at the. time of cessation; <br />(ii) what specilic measures h;rve been and will be implemented to comply with reclamation, <br />performance standards and Environmental Protection Plan requirements, if they ~tre part of your <br />approved apphcarion: and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional tollowin; information with your Annual Report, as applicable: <br />(a) Per dte requirements of 2 CCR -107-I, d07-4, and Rules 1.151 l i. provide an updated statement <br />regarding the sufficiency of the value of the Financial Warrmuy, specifically: <br />(Ij Per the requirements of 3 CCR 407-1, -t07--3. and Rules 1. ].it I ~(a). p,ovtde an updated <br />statement reg:udin, the sufficiency of the value of the financial w:uTanty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security a,reements. self-insurance, salvage <br />credit, and first prioriap liens on project related fixtures. <br />(ii) Per the requirements of Z CCR x07-1, 407-4, and Rules I.1 ~(I l(bi, pcnnits secured with a <br />Dead of'frusi or a Security Agreement, the operator shall submit an update. by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summ:uizing <br />:m} circumstances' which may affect the adequacy of the Deed of Tnist, or Security Agreement, <br />and the value of the propert}' suhject to either of these instnunents. <br />'['Fte report shall also provide proof that there are no past-clue property taxes. <br />tiiii Per the requirements of '_ CCR 407-I. 407-4, and Rules -1.7(3), perrni[s secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide do~:umentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrain~ that [he <br />Lever of Credit does nut exceed tzn percent (109x) of the bank's capital :;utplus accounts. <br />(vi) Per the reyuirentents of_ CCR 407-I, 407-4, and Rules '..~). 3(c), pemtit secured by s First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures <br />antl equipment. <br />(b) Per thz requirements of .! CCR 407-1.407-=}, and Rules 1.15(])(c), all monitoring information <br />required as pan of the. approved permit application, to include the Environmental Protection Plan. <br />(Please not? the[ if ycu are ncx a Designated Mining Operation. you will not have mt Environmental <br />Protection Plan as pmt of }'our approved permit.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.