My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP09617
DRMS
>
Back File Migration
>
Report
>
REP09617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:39:12 PM
Creation date
11/27/2007 12:11:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977575
IBM Index Class Name
Report
Doc Date
5/10/1999
Doc Name
110C ANNUAL FEE INVOICE & REPORT REQUEST CONSTRUCTION MATERIALS OPERATIONS
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ANNUAL F~EPORT <br />INSTRUC'.TIONS <br /> <br />According to C.R.S. 34-32-116(3), and C.R.S. 3-3-32.i-I l ti(;1(a), on the anniversary date of thz permit each year. <br />the operator shall submit a report and a map showing thz extent of current disturbances to affected land. <br />reclamation accomplished to date and during the preceding }'ear, nzw disturbances that are anticipated to occur <br />during the upcoming year. and reclamation [hat will be performed during the upcoming year. Pleasz attach Bach <br />a report and map to enclosed annual report form. (An adequately labeled map [hat clearly delineates and includes <br />the above elements may suffice for a v, ritten report. ) <br />If your operation is subject to the provisions of'Temporary Cessation as defined in the A.ct and Rules, you must <br />provide with the Annual Report the following information as required by 3 CCR 467-1, 407-4, and Rules <br />1.13.7(1)(a): <br />(I) the condition of the operation at the time of cessation; <br />(iil shat specific measure; have been and will be implemented to comply with reclamation. <br />performance standards and Environmental Protection Plan requirements, if [hey are pan of your <br />approved application; and <br />(iiij plans for resumption of mining operations. <br />Please provide the additional folloting inforntation with your Annual Report, as applicable: <br />ta) Per the requirzments of "_' CCR 407-1.407--}. and Rules I.1~(lj. provide an updated statement <br />regarding the sufficient}' of [he valuz of the Financial Warrant}'. specifically: <br />(Ij Pzr the requirements of 2 CCR 407-I. 407-4, and Rules 1. ] d(])(a), provide an updated <br />statement rzoardin~ the sufficiency of the value of the financial watracty. Specifically. <br />irrevocable letters of credit, Deeds of Trust, and security agreements. self-insurance, salva~z <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407=1. and Rules 1.1~(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an updatz. by a qualified <br />independent appraiser, indica[in~ am' ch,tnees in property value, and a statement summarizing <br />any circumstances which ma}' affect the adequacy of thz Deed of Trust, or Security Agreement, <br />and the value of dte property subject to zither of these instnrments. <br />The report shall also provide proof that there are no past-due property taxis. <br />(iii) Per the requirements o(2 CCR 407-1, 407-4. and Rules 4.7(. ), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certifizd by a Certified Public Accountant, demonstrating that the <br />Letter of Credit does not exceed ten percent t 1(1%) of the bank's capital surplus accounts. <br />(~-ij Per the requirements of CCR 407-].407-4, and Rules 4.93(cl, permiU secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall proeioe a report in suftcient <br />dztail to fully describe the condition, value, and location of all pledged fixtures <br />and zquipment. <br />(bj Per thz requirements of 2 CCR 407-].407-4. and Rules 1.15(11(c), all monitoring information <br />rzquirzd as part of the approved permit application. [o include the Environmental Protection Plan. <br />(Please note that if you are not a Designated Mining Operation, you will not have an Environmental <br />Protection Ylan as part of your approved perntit.l <br />
The URL can be used to link to this page
Your browser does not support the video tag.