Laserfiche WebLink
. Ill IIIIIIIIIIIIIIII <br />999 <br />March 26, 1998 <br />RECEIVED <br />P1AR 3 0 i99H <br />Mr. Jim Dillie <br />Division of Minerals and Geology DivisionotMinerals&Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />_ DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report - - <br />March 22 - Ma///rcJJJh 28, 1998 <br />Dear Mr. Dillie: ~. <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of March 22 - <br />March 28, 1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged <0.010 ppm CN-wad and 0.036 <br />ppm CN-total. The collection pond averaged 0.029 ppm CN-wad and 0.0-8 <br />ppm CN-total. <br />Sincerely, <br />Julio F. Madrid <br />cc: Bill Lyle <br />Dan Robertson <br />