My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-05-28_REPORT - M1986104 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1986104
>
1999-05-28_REPORT - M1986104 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2021 9:03:44 AM
Creation date
11/27/2007 12:08:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986104
IBM Index Class Name
Report
Doc Date
5/28/1999
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII 2� C <br /> Notice of Intent to Continue Mini 1�/c <br /> 112c Construction Materials nual <br /> Permittee Name: B & B Excavating Inc <br /> Permit No. : M-86-104 `A AY 2 p 1709 �O <br /> Operation Name: Montgomery Pit IYI <br /> Anniversary Date: May 24, 1999 <br /> Total: $550.00 (Due on your. ive ]ORWNERAI.s <br /> �&GEOLOGY A � <br /> 1. a. Permitted acreage: A16. / b. County wh is located: £ 6 <br /> 2 . Has this mine been granted TEMPORARY CESSATION STATUS? YES <br /> Does this mine operate MORE or LESS than 180 days per year? <EDPLESS <br /> 3. Does this mine have a phased reclamation plan? YE NO <br /> 4. Total acres affected during the report year: * 9,p <br /> 5. Total acres reclaimed for the report year: ' 0i3 <br /> 6. Total number of acres in topsoil replacement stage: 0. 0 <br /> a. Average thickness of topsoil replaced: <br /> 7 . Total number of acres seeded: 01 A <br /> a. List species seeded & seeding rate for report year on back <br /> 8. For non-phased operations provide dates extraction ceased: <br /> a. Date reclamation began: 3&7 <br /> 9. The type and approximate quantity of fertilizers, organic material or soil <br /> conditioners used for the report year: /i� TOA1/IpGQ� (tJC / P1,9E,e /)l1JLco <br /> 10. Estimated total acres to be affected in the next report year: * O'S <br /> 11. COMMENTS: AIA1/Al6 W/w /lt0✓E e!F*St— IN 8WYC 3 IoV 7—We- <br /> UPC401x/A.E0 YE—" . <br /> Please show the location of the acreage for items 4 - 6 on your map'*. Indicate <br /> the phases of the reclamation which have been completed, correlated with your timetable. <br /> For phased operations show dates extraction ceased and dates reclamation began. <br /> " NOTE: If there have not been any changes since the last annual report and you <br /> previously sub ed a map which correctly depicts the c�_rrent acreage in items 2 through <br /> 6, then a ne map is unnecessary. However, this must be stated above. <br /> 57, <br /> / L/� `� Ql Signature: �' C� G Date: <br /> Please type or print current contact name, mailing address, and phone number below: <br /> Contact Name: &T.SY BL/FA7AF0k6 Phone: ( 970) %a6 331 <br /> FAX NO: ( 97D) y.Y6 A31�t <br /> Company: .04 9 FX(_1411.4T//U6C 1A)C. <br /> Address: too, '0P4uf2 0?H9 <br /> Federal Tax ID No. or Social Security No. : O p Y �6 o�3 S0C <br />
The URL can be used to link to this page
Your browser does not support the video tag.