~1
<br />ANNU.~L REPORT
<br />INST:RU~CTIONS
<br />
<br />According to C.R.S. 34-32-I 16(.3), and C.R.S. 34-3:?.5-I 16(3)(x), on the anniversary date of the permit each year,
<br />the operator shall submit a repot'and a map showing [he extent of current disturbances [o affected land,
<br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur
<br />during the upcoming year; and rt:clarnation that will be performed during the upcoming year. Please attach such
<br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes
<br />the above elements may suffice for a written report.)
<br />If your operation is subject to the: provisions of Temporary Cessation as defined in the Act and Rules, you must
<br />provide with the Annual Report the following infornation as required by 2 CCR 407-1.407-4, and Rules
<br />1.13.7(I)(a):
<br />(i) the condition of the operation at the time of cessation;
<br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance
<br />standards and Environmental Protection Plan requirements, if [hey are part of your approved application; and
<br />(iii) plans for resumption of mining operations.
<br />Please provide the additional following information with your Annual Report, as applicable:
<br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement
<br />regarding the sufficiency of the value of the Financial Warranty, specifically:
<br />(i) Per the requirements of 2 CCR X107-1, 407-4, and Rules 1.15(1)(a), provide an updated
<br />statement regarding the sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage
<br />credit, and first I~riority liens on project related fixtures.
<br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules I.15(1)(b), permits secured with a
<br />Deed of Trust or a St:curity Agreemt:nt, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating an,y changes in property value, and a statement summarizing
<br />- ~--- - - - - -any circumstances which-may-affect-theadequacy-of-the Deed-of Trust,-or-Security-agreement, --
<br />and the value of the property subject to either of these instruments. The report shall also provide
<br />proof that there ire no past-due property taxes.
<br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter of Credit, [he operator shall have the bank provide documentation in the form
<br />of a balance sheet, certified by a Cenified Public Accountant, demonstrating that the Letter of
<br />Credit does not exceed ten percent (10%) of the bank's capital surplus accounts.
<br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien on ~tny ftxtures and Equipment, the operator shall provide a report in sufficient
<br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment.
<br />(b) Per the requirements ~~f 2 CCR 407-1, 407-4, and Rules I.15(I)(c), all monitoring information
<br />required as part of the approved permit application, [o include the Environmental Protection Plan. (Please
<br />note that if you are not a.Designated Mining Operation, you will not have an Environmental Protection
<br />Plan as pan of your approved permit.)
<br />
|