Laserfiche WebLink
~~I ~I~~~~~I~~~~~~~~ .! <br />'~~FiTTi~?PT'~ `ciTiZl Z~~SIICi~~FS <br />CO^iSULTING GEOTECHNICaS, ENG?^IcERS P.~ID MP.'?'6EI?.i.. T°STIVG <br />DAILY FIELD REPORT <br />PROJECT NUMBER D96046MT DATE 3/18/96, Monday <br />PROJECT NAME Oakridge Energy <br />PROJECT LOCATION Durango, CO <br />CLIENT Goff Engineering <br />CONTRACTOR Durango Construction <br />TECHNICIAN N. West <br />WEATHER CONDITIONS <br />Partly cloudy & windy <br />WORK REQUESTED <br />Field Density Testing <br />FOREMAN John Griffith <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the Oakridge Energy project site at 3:45 p.m. as requested by Mr. <br />Harry Goff, Goff Engineering. I assessed the location of the new fill material and <br />performed field density tests on the western side of the lower fill area. I left the site <br />and returned to the office at 4:45 p.m. <br />P.l7. BOf! 7925 P.O. BC`: JO„ __. 9cdo Cr.ve <br />Go n]~ JLY C'C:GS, C., 14CPITRCB=. CC. S1{~]'_ DL: A>tGJ. CO. 2=)~]; <br />70)1 7J3-:+OS (''_Oli 2J9-: LS, Ila)I 253-5095 <br />