Laserfiche WebLink
<br />Seneca II-W 1996 Rill and Gully Survey <br />Area Number Description of action required Date to finish <br />I Gully near outflow of G3 pipe lobe reshaped <br />and additional riprap placed 10-31-96 <br />2 Gully along fill and outflow of GS riprap <br />3 Gully from drainage at neck pit to 009 <br />riprap and reshape <br />4 Rills in breached contour ditches in 95 <br />seeded area, reshape and revegetate <br />5 Outflow of F4 pipe needs redirected in order <br />to flow over riprap <br />6 Drainage above 006 requires riprap, <br />stock tank construction, reshaping <br />7 Outflow of clean water diversion needs riprap <br />10-31-96 <br />I 0-31-96 <br />I 0-31-96 <br />10-31-96 <br />10-31-96 <br />10-31-96 <br /> <br />