My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP09392
DRMS
>
Back File Migration
>
Report
>
REP09392
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:39:02 PM
Creation date
11/27/2007 12:07:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976051
IBM Index Class Name
Report
Doc Date
5/6/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPEATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- --- - <br />.. ~~~ II~II~~I~~~~~ ~I~ <br />Notice of Intent to Continue Mining Operations <br />112c Construction Materials Annual Re <br />CEIVED <br />Permittee Name: Duckels Construction Inc <br />Permit No. M-76-051 X1111 Q <br />Operation Name: Bettger Gravel Pit 1 6 ~99~ <br />Anniversary Date: May O8, 1997 <br />Total: 5550.00 (Due on your Anrbi)~)SlOn ary Date) <br />of mmera)s tt <br />VT <br />1. a. Permitted acreage: ~ q ~ b. County where mine is loca ~~BY <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 180 days per year? LESS <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during the report year:* <br />5. Total acres reclaimed for the report year:* 2- <br />6. Total number of acres in topsoil replacement stage: ~~ <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: U <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* J~~ <br />10. Estimated tonta~l,,acres to 1b1e affectlIe~~d~~in the next report year:* ~~ <br />11. COMMENTS: QZi,l+M AT7ON (1 iL/ 1`~t~1/~ (N ~Cbl {Ff(,k"~ ~1 ('1~ ,SI~M.N~'~_ <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTH: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ~ ~~~ ~ Date: ~~Z~~ <br />Please type or print~cu,~rrent connt~act name, mailing address, andGp~hone n(u~mberlbelow: <br />Contact Name: I /C ISI L• LJI/l /~~S Phone: ( /~(~ ) Z~7G~ lv~7zff- <br />/' ~ ~ ~,~ ~~~r-~ - l / FAX N0 : ( ) ~] / ' ~0 7 y % <br />Company:/.V^!'~j~S.~'/ ~C.nPY1~b{/ /GIA 1 IL7v~ I N(~ <br />Address: 4~L J(~ I~~l` 1T ~~ <br />~111J~~1~S, . ~6 ~0~~7 <br />Federal Tax ID No. or Social Security No.: i\`7 ~(/1097~4~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.