My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP09331
DRMS
>
Back File Migration
>
Report
>
REP09331
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:59 PM
Creation date
11/27/2007 12:06:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Report
Doc Date
9/25/2006
Doc Name
2nd Quarter 2006 Wastebank Inspection Report
From
Peak Project Management, LLC
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Elk Mine <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: NEW EL <br />Waste Bank MSH <br />Inspection Period: <br />Inspection Date: <br />General Description or Reference to S"rte Plan: <br />The Development Waste Disposal Area is located south of State Highway 12 and west of <br />the main facility Access Road. It is adjacent to and north of the Middle Fork of the <br />Purgatoire River. The area has been used for disposal of waste rock from the underground <br />mine. Since mine Gosure in 1989, the area has been used for disposal of sediment removed <br />from ponds and ditches located within the mine permd area. <br />Activity During Inspection: <br />Sediment from the clean-0ut of pond 8 has been transported to and placed on the upper west <br />half of the waste pile for drying. The operator continues to respread and work the waste to aid in <br />~ drying. An unusualty dry spring has aided in speeding the drying process. Approximatety 300- <br />30 yard loads were transported to the DWP. Additional Toads were temporarily placed on an otd <br />coal stockpile area for drying and have not been transported to the DWP. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction and/or <br />discharge, integrity of 100-year 24-hour drainage structures, and evidence of posfive drainage). <br />Positive drainage is maintained on the surface of the DWP. Na evidence of springs nor seeps <br />was observed. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />Continued drying and compaction followed by a "rolling compaction test" needs to be documented <br />prior to depositing addition refuse on the pile. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.