Laserfiche WebLink
<br />S <br />• INTRODUCTION: <br />This is the 1986 hydrology report for the Somerset Mine. The <br />mine status is that of temporary cessation. The portals were <br />sealed during May and June. <br />The property is located 11 miles east of Paonia aloncj State <br />Highway 133. <br />Elk Creek, Bear Creek, and Hubbard Creek flow across the <br />property to the North Fork of the Gunnison River (see Nep 2). <br />Elk Creek which drains the eastern portion of the property has <br />intermittent, seasonal flow. Bear Creek is an ephemeral <br />stream, which drains the central portion of the mine holdings. <br />Peak flows occur during runoff. Hubbard Creek is a perennial <br />stream which drains the western portion of the reserve. <br />During 1986, Raiser submitted a water management plan to replace <br />the original, approved water inflow study (Permit No. C-81-022). <br />The objectives of this program are to gather Hubbard Creek <br />baseline flow and quality data and water inflow rates into the <br />sealed mine workings. The monitoring stations for this program <br />are: <br />H-1 - Surface water station located along Hubbard Creek just <br />below the culvert at the former fan site. mhis <br />station continues to provide stream flow and quality <br />baseline data. <br />H-10 - Groundwater well located at previous upper substation's <br />site along Hubbard Creek. This station monitors Water <br />inflow rates into the sealed mine workings aifd <br />quality. <br />B-6 - Former power hole located along Bear Creek used as <br />groundwater well to monitor water inflow rates a1'i'd• <br />quality in Three Dip mine area. Degas well, B-5 <br />provides a backup station, if required. <br />The following sections of this report describe the methods and' <br />results of the monitoring activities at the Somerset dine sti'~e.~ <br />SURFACE WATER MONITORING <br />Quarterly surface water samples for flow and water quality were <br />taken during March, June, September and December. <br />The sampling stations are: <br />H-1 - Station located along Hubbard Creek below culvert at <br />former fan site. <br />H-2 - Station located along Hubbard Creek adjacent to <br />crusher pad below the Blue Ribbon Mine. <br />