Laserfiche WebLink
2000 Annual Report <br />Stormwater Management Plan <br />Cazbon Junction Mine <br />Page 2 <br />Comprehensive inspection of all aspects of the mine operation, including stormwater <br />management practices was undertaken by CDMG during complete quarterly inspections of <br />the mine during calendar year 2000. During the May 10, 2000 and August 16, 2000 <br />inspections the CDMG inspector expressed concern regarding the freeboard of the ditch at <br />the head of the permanently reclaimed spoil area. In the October 31, 2000 CDMG <br />inspection it was noted that all ditches were in compliance. No enforcement actions were <br />issued to the operation for non-compliance with the requirements of the surface water <br />control plan or regulations. <br />STORMWATER MONITORING (2000) <br />No specific stormwater monitoring was required or undertaken during 2000. <br />CERTIFICATION <br />I certify under penalty of law that this document and all attachments were prepared under <br />my direction or supervision in accordance with a system designed to assure that qualified <br />personnel properly gather and evaluate the information submitted. Based on my inquiry of <br />the person or persons who manage the system, or those persons duectly responsible for <br />gathering the information, the information submitted is to the best of my knowledge and <br />belief:, true, accurate, and complete. I am aware that there are significant penalties for <br />submitting false information, including the possibility of fine and imprisonment for <br />knowing violations. <br />Duly authorized reps <br />of Oakridge Energy, <br />Date <br />