Laserfiche WebLink
Y '• <br /> <br />6) New wells drilled as a result of the facilities relocation <br />technical revision should be included in the monitoring program desc H ption in <br />Section 3 of the•'permit. Revised pages should be submitted. <br />7) NC EC should note that the Division has not approved the wells <br />drilled in the proposed loadout~area. The Division remains concerned about <br />the completion of We11s OW-15 and OW-16 in particular. Monitoring of these <br />wells may potentially be unacceptable as baseline data. <br />8) Baseline data indicates generally poor water quality in the area of <br />the mine site. The magnitude of this problem may not have been fully <br />identified, due to some abnormally (and possibly erroneously) high detection <br />limits used in the laboratory sample analysis. The Division may at some time <br />in the future require NC EC to perform additional monitoring related to this <br />situation. No action is required by the operator at this time. <br />The Division would appreciate responses to these issues as soon as possible. <br />If you have any questions, please contact me. <br />Sincerely, <br />7~ ~~~ <br />Jeffrey Deckler <br />Reclamation Specialist <br />JD/srs <br />0910E <br />