Laserfiche WebLink
Meroo to Joe Dudash <br />Bowie #2 Waste Pile Inspectiou <br />page 4 <br />Further, the two initial quarterly waste pile inspection reports appear to be unacceptable. The <br />more waste material that is placed upon the pile, the more difficult and costly the completion of <br />appropriate and acceptable compaction verification will become. I recommend that you <br />communication the increasing urgency of this situation to the operator. In addition, as you know, <br />I will be in the valley from August 25th through 27th, and could visit the site if desired. <br />cc: Dave Berry <br />doc: M:\COAL\JAP\BOW2COMP.WPD <br />JP/jP <br />