My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP09149
DRMS
>
Back File Migration
>
Report
>
REP09149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:51 PM
Creation date
11/27/2007 12:03:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Report
Doc Date
2/5/1998
Doc Name
GOLDEN EAGLE MINE REFUSE PILE ID 1211-CO-09-02820-01
From
BASIN RESOURCES INC
To
MINE SAFETY & HEALTH ADMINISTRATION
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iuiiiiiiiiu iii <br />14300 Highway 12 <br />Weston, Colorado 81091 <br />(719) 868-2761 <br />Purchasing (719) 868-2768 <br />Fax (719)868-2275 <br />BASIN <br />RESOURCES, inc. <br />a subsidiary of ENTECH, Inc. <br />Johr! A. Kuzar <br />Mine Safety & Health Administration <br />P.O. Box 25367 <br />Denver, CO 80225 <br />February 5, 1998 <br />Re: Golden Eagle Mine <br />Refuse Pile: i.D. No. 1211-CO-09-02820-01 <br />Request for Abandonment <br />Dear Mr. Kuzar: <br />The Golden Eagle mine opened in the late 1970's and was operated by Basin Resources from June 1991 to <br />its closure on December 31, 1995. The laz[ refuse was spread and compacted on [he above referenced <br />Refuse Pile (RDA) in January of 1996. In November of 1996 final contouring and grading of the refuse <br />was completed and final drainage established. <br />The pile was covered with an average of two to three fee[ of subsoil nta[erial in December of 1996. Test <br />pits were dug [o verify depths of subsoil material and grade stakes set to mark the additional topsoil needed <br />to achieve four fee[ of final cover. This topsoil material was placed in May of 1996, followed by seeding <br />and mulching. <br />In 1995 CTL-Thompson was contracted to do a stability analysis of the RDA. Compaction tests were <br />made in 1995 and again in March of 1996 after mine closure and final placement of refuse. A follow up <br />evaluation of the reclamation of the RDA was made by CTL-Thompson in January 1998. Their <br />conclusions supporting the stability and abandonment of the refuse pile are contained in llte enclosed <br />report. <br />Based on the completed reclamation of the refuse pile attd the CTL-Thompson stability analysis, Basin <br />Resources requests approval for the abandonment oFthe Golden Eagle Refuse Pile ID No. 121 I-CO-09- <br />02820-01. <br />Please contact me if you have any questions or need additional infotma[ion <br />SirJSerely. ~,/ ~9 <br />~Id .Thompson <br />Property Manager <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.