My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP09102
DRMS
>
Back File Migration
>
Report
>
REP09102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:49 PM
Creation date
11/27/2007 12:02:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
4/8/2004
Doc Name
1st Quarter 2004 Coal Mine Waste Bank
From
J.E. Stover & Associates
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOWIE RESOURCES LIMITED <br />Bowie No. 2 Mine <br />Coal Mine Waste Bank Inspection - 151 Quarter 2004 <br />On March 27, 2004, I performed the required quarterly visual inspection of the Bowie No. <br />2 Mine coal mine waste bank in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. The gob disposal area was dry to damp. All organic <br />material and topsoil has been removed ahead of the waste bank founding. <br />The construction of the pile has progressed above the third terrace (=6120'). The out <br />slopes of the terraces have been covered. The depth of cover has not been verified. <br />Most of the coal mine waste was generated from the mine. Approximately 1,560 tons of <br />gob were hauled to the gob pile. Coal mine waste is to be placed in the pile in <br />approximately horizontal lifts no more than 24-inches thick. The coal mine waste is <br />spread and compactive effort is provided by a self propelled sheepsfoot compactor or a <br />front-end loader. Compaction tests were performed on March 11`" and 17`". One of the <br />March 11 `h tests (#5) failed. The area around test site #5 was reworked and compacted <br />and was retested on March i 7"'. Except for the test that failed and was retested, the tests <br />attained at least 90% of the maximum dry density attained in a laboratory compaction test <br />in accordance with ASTM D698. Relative compaction test results are enclosed. <br />A failure of the pile would probably not be a hazard to human life. The pile is located <br />above a large flat bench. The bench is approximately 80 to 150-feet wide directly below <br />the pile. Additionally, the gob pile sediment pond is located below the pile. If the coal <br />mine waste bank failed, the material would very likel~~e,sc~ained on the bench below <br />the pile and or within the gob pile sediment pond'+QP~4 R EC~SlF+~ <br />*q~0 ~.~~ t STG ~ qE, ~ <br />~e~ssos• <br />~na~ E <br />--4•~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.