Laserfiche WebLink
<br />NORTHWEST COLORADO CONSULTANTS, lNC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: <br />Client: Bower Brothers Construction <br />Work Performed: <br />Date: 7118/95 <br />Time: 2.0 <br />Mileage: 22 <br />Engr.ITech: JK <br />As requested. we visited the project site to conduct nuclear density tests #& through #9 on the matehal being <br />placed. <br />The excavation contracror, Bower Bros., placed and compacted 1 foot of processed waste coal on tap of previous <br />placement east of the drain along the toe butVess for the waste coal pde. <br />Remarks: <br />The material tested generally met project specifications. <br />Moisture samples were obtained and resumed to our laboratory far moisture content testing. Samples #2, #3 <br />and #4 which were also obtained from the processing plant. stockpile and coal pde and were returned to our <br />laboratory for standard checkpoint Proctor testing. The sample from the stockpile did not match previous values <br />and a full Stantlard Proctor and classification were performed (designated as #2 for this job). Samples #3 and #4 <br />matched previous Proctor curve #1. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers was informed of today's test results. <br />