Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project; Waste Coai Pile Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: <br />Client: Bower Brothers Construction <br />Work Performed: <br />Date: 7M4/95 <br />Time: 1.0 <br />Mileage: 22 <br />EngrJTech: JK <br />As requested, we visited the protect site to conduct nuclear density testing. At the time of our visit, inclement <br />weather prevented the possibility of compaction testing. We obtained a sample of the waste coal and returned it to <br />our laboratory for checkpoint Proctor testing. The results did not match the previous Proctor for this job completed <br />by CTL Thompson. Therefore, we performed a full Standard Proctor test with classification (Sample #~). The <br />results are attached. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers informed us fo return on7l17/95 to conduct nuclear density tests. <br />