Laserfiche WebLink
NORTHWEST COUORADO CONSULTANTS, I~ <br />Project: Waste Coal Pile Projeei No.: 95-2296 <br />Location: Fordel Creek Mine Report No.: 2 <br />Client: Bower Brothers Construction <br />Work Performed: <br />Date: i/17/95 <br />Time: 1.5 <br />Mileage: 22 <br />EngrJTech: JK <br />As requested, we visited the project site to conduct nuclear density tests #1 through #5 on the matenal being <br />placed. <br />The excavation contractor. Bower Bros., placed and compacted 4 feet of processed waste coal east of the drain <br />along the toe buttress for the waste coal pile. <br />Remarks: <br />The material tested generally met protect specifications. <br />Samples of the waste coal tested were returned to our laboratory to determine moisture content as the nuclear <br />gauge reads high in error when testing hydrocarbon materials. This wrll be the standard procedure for the testing <br />of materials for this project. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers was informed of for today's test results. <br />