My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-10-03_REPORT - M1977348
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977348
>
1984-10-03_REPORT - M1977348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2020 5:39:25 AM
Creation date
11/27/2007 12:02:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
Report
Doc Date
10/3/1984
Doc Name
Annual Fee/Report/Map
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL REP REP011111PR OCTOBER 10, 1984, PER41T X#MSARY <br /> BOETTCHER MnTONE QUARRY -- PEFMT NO. 717=348 <br /> LARIMER COUNTY, COLORADO <br /> IDEAL BASIC INDUSTRIES, INC. , CEMENT DIVISION <br /> Since the resumption of production at the Boettcher cement plant about March 1, <br /> 1984, the bulk of the raw material has been quarried from the "E"-bands between <br /> the plant site and the Windsor Reservoir and Canal Comany flood ditch. Some <br /> weathered "E-3" has been used from north of the ditch. No "C"-band cut has been <br /> opened yet, nor has such an opening been definitely scheduled. Quanryi.ng <br /> has been continued in those areas which have been previously disturbed, and it <br /> is anticipated that this operation will continue for the next year. Updated <br /> maps for the Boettcher quarry are included. <br /> 1. Location and Nuaber of Acres Affected During the Year. <br /> Operations have continued in the same areas, between the plant and the flood <br /> ditch, and just north of the flood ditch, as previous operations. No new <br /> areas have been disturbed, and all operations have remained in the presently <br /> bonded areas. <br /> 2. Locations and Number of Acres Reclaimed During the Year. <br /> No reclamation was done during the past year. All areas, except for the north <br /> 1800 feet of the A-band quarry, must be considered active sing: they will be <br /> redisturbed in future mining operations. <br /> 3. Location and Number of Acres in Various Stages of Reclamation. <br /> Negotiations are still under way between Ideal and possible users of quarry <br /> for landfill operations. 'These potential users include Larimer County and <br /> Anheuser-Busch. If negotiations axe not successful, reclamation will pro- <br /> ceed according to regulations. <br /> 4. Species of Vegetation Planted, the Locations and Approximate Dates of Planting. <br /> Not applicable at this tine. <br /> 5. Type and Approximate Quantity of Fertilizers, Organic Material, or Soil Con- <br /> ditioners Use an Iocatioui o Use. <br /> Not applicable at this time. <br /> 6. Appraisal of Results of Reclamaticn Efforts. <br /> Not applicable at this time. <br /> Estimates of Location and Number o Acres to be Affected in the Coming Year. <br /> 7. t f g <br /> Present projections are to continue quarrying in the same area as current <br /> operations, that is, the bulk of the material being obtained from the "E"-band <br /> quarry between the plant and the flood ditch. A minor amount of weathered <br /> "E"-band will be quarried from the area immediately north of the flood ditch. <br /> All operations for the year are expected to be within the cunrcntly affected <br /> and bonded areas. <br /> 8. The effective date of the information provided above is September 15, 1984. <br /> No change in bonding is indicated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.