Permittee: WHITEWATER BUILDING MATERIALS CORP. PAGE 2 <br />Permit #: M-1977-129 <br />Operation Name: WHITEWATER 500 PIT <br />Anniversary Date: 09122/07 <br />ahead of the working face in Stage F and on the west side of <br />Stage 2 if needed. <br />(2) Sloping was completed on 727 feet around perimeter of Phase <br />2 - PART A and 3260 feet of slope in Stage 2 - PART B <br />(green). The blue cross hatched areas show where we have <br />material stored to create slopes in Stages 2 - PARTS A & B. <br />Only final grading is necessary on these two areas. <br />We continue to monitor the area in Stage 4 - PART B that was <br />reclaimed in 2005. Phases X, Y, & 1 were released from the <br />permit on February 28, 2007. A copy of the release approval <br />letter is attached <br />There is approximately 20,000 cy of overburden stored in <br />Phase 2 - PARTS A, & B & Phase D that will be used on the <br />alpha stages and in Phase 2 - PART A as needed (orange). <br />These piles are in a constant state of flux with material <br />being added and removed as areas are stripped and resoiled. <br />The settling pond is still being used to clean process water <br />{gray). The stockpiles on the lake bottom in Phase 2 - PART <br />A will be removed or leveled as needed. The access corridor <br />is being utilized to cross the highway when material from <br />the mined area is moved to the plant (heavy blue line). <br />Weed control continued this year on the area around the <br />active mine and on the area around Phase 2- PART A. We <br />sprayed Knapweed and White Top on May 1 & 2, 2007 and on May <br />11, 2007 with water soluble 2-4-D and Curtail'. Approxi- <br />mately 1200 gallons of spray mix was use on the Plant Site <br />area and along the area covered by the yellow line on the <br />map. Spraying is finally beginning to have positive results <br />against the Knapweed and White Top. This is still an uphill <br />battle since there is little or no control taking place on <br />properties surrounding the mine and seed is being wind blown <br />in from offsite areas that we have no control over. Spray- <br />ing will continue as needed. Tamarisk control and Russian <br />Olive removal continued along the mine access road and on <br />the western side of Stage 2 - PART A. <br />(3) Mining will continue on Stage 2 - PART B this year working <br />on the floor until all gravel is mined. In Stage 2 - PART A <br />we will continue to clean the floor in the mined area and <br />removed material from the partially mined area west of the <br />Plant Site until all material is removed from the Stage. In <br />Stage F the mine face will continue to move to the east. If <br />more area is needed, we will resume stripping ahead of the <br />mining face. Overburden will continue to be stockpiled <br />along the perimeter of the mined area. <br />