My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP08887
DRMS
>
Back File Migration
>
Report
>
REP08887
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:39 PM
Creation date
11/26/2007 11:59:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Report
Doc Date
10/6/1995
Doc Name
Operator responses to 1994 AHR Review
From
BASIN RESOURCES INC
To
DMG
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' • ~ ~• <br />Page 3 <br />~~ 10. The well completion information will be maintained as records at the mine site per CRS <br />34-33-122(2)(b). Basin considers well completion information confidential due to its <br />Lis proprietary, commercial nature. The Division may review these during their inspections. <br />11. The 1994 wells were not drilled until the fall of 1994. Baseline data has not been <br />~~ <br />completely acquired. Basin will provide a supplement to Exhibit 8 in conjunction with <br />`, ,,,~/ t t~ North Pod permit revision. <br />Q„ Surface Water <br />V~ <br />~V`r~ 1. Field parameter information has been added to data recorded from site GE-002 to the <br />~~ extent possible. All other errors have been corrected. This has. resulted in changes in <br />pages A-16 through A-20,and A-23. <br />2. Additional field and flow information for site GE-003 was provided where available. <br />Changes have been made to pages A-24 through A-25. Values for total hardness were <br />O not available for the month of Novertiber and is not required for [his location. Settleable <br />solids was not measured November 17 and 18, 1994. <br />l~ 3. Flow and field values for site GE-004 were added to Table A-12 for 8-4-94 and 8-29-94 <br />(A-26). The EC for 11-3-94 is not available. <br />4. All available Flow values for site GE-005 have been added [o [he table, resulting in <br />changes to pages A-27 and A-28. <br />/5. All available flow values for site GE-045 have been added to the table. The minimum <br />V value for EC has been corrected. Pages A-29 through A-32 were modified. <br />There was no flow at site LCS-1 in December, and the column for December has been <br />/ deleted (A-35 and A-37). <br />I/. Additional flow and field data for site NE-007 has been added to the table for all <br />VVV/ sampling events for which it was available (A-43 through A-45). <br />/8. Flow and field information for site NE-008 has been added for August 29, but was not <br />VVV available for other dates (A-46). <br />There is no NE-003. However, the sewage treatment plant is NE-033, and all available <br />information has been incorporated into Table A-25a (A-47 through A-47c). Flow <br />information was recorded as zero in the field notes, to reflect anon-discharging situation, <br />
The URL can be used to link to this page
Your browser does not support the video tag.