My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-03-19_REPORT - M1981302
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981302
>
1997-03-19_REPORT - M1981302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 3:19:17 PM
Creation date
11/26/2007 11:58:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
Report
Doc Date
3/19/1997
Doc Name
INITIAL RECONNAISSANCE OF DRAINAGE NETWORK AND SOUTH BOULDER CREEKS HYDROLGOY HWY 36 TO APPROXIMATEL
From
TAGGART ENGINEERING ASSOC INC
To
URBAN DRAINAGE AND FLOOD CONTROL DISTRICT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> SCOPE <br /> ' UDFCD executed an agreement with Taggart Engineering Associates, Inc. (TEA) to <br /> conduct an initial West Valley hydrology study of South Boulder Creek spills <br /> downstream of Highway 36 to the area of the Wellman Ditch. <br /> Specific tasks include: <br /> 1 Request and review hydrologic modeling data by the Corps. <br /> • Validate or modify the model with respect to the Viele Channel, Dry Creek <br /> Ditch No. 2, and the West Valley Overflow. <br /> • Conduct a field reconnaissance to identify hydraulic control structures and <br /> conveyance characteristics along combined overflow and local drainage <br /> routes. <br /> • Prepare an initial hydrology model of the West Valley Overflow area from <br /> Highway 36 to the Wellman Ditch and link this model to the Corps' model. <br /> • Approximate hydraulics for flow splits and conveyances. <br /> • Prepare a brief report with schematic maps describing the overall effort. <br /> DATA OBTAINED AND REVIEWED <br /> The data obtained for the Phase II effort included: <br /> • Selected pages from Corps' reports on Boulder and South Boulder Creeks <br /> hydrology. <br /> • Corps' worksheets showing development of design rainfall hyetographs. <br /> • Corps' SWMM sensitivity results for the Boulder Creek Study. <br /> • Corps' parameter worksheets (area, lengths, and rainfall). <br /> • SWMM executable file (the Corps' model used the EPA version of SWMM). <br /> • As built information on some drainage structures. <br /> • City electronic and hard copy topographic and features maps including the <br /> entire tributary area (except Bear Canyon Creek) from the confluence with <br /> Boulder Creek to the hog backs. <br /> Studies and plans included: <br /> • City of Boulder Storm Water Collection System Master Plan, WRC, December <br /> 1984. <br /> • City of Boulder Big Dry Creek Ditch II Preliminary Design Report, MWE, <br /> February 1996. <br /> • 55th Street Improvements Baseline Road to Arapahoe Avenue Plans, Carter <br /> 1 Burgess, June 1996. <br /> 1 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.