My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP08825
DRMS
>
Back File Migration
>
Report
>
REP08825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:36 PM
Creation date
11/26/2007 11:58:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
3/30/1994
Doc Name
SECTION 16 FILL FIRST QTR REPORT 1994 COLOWYO COAL CO
From
COLOWYO COAL CO LP
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ ~ l <br />•~~ <br />P G <br />O D <br />O O O <br />For: J. A. Kiger <br />March 23, 1994 <br />SECTION 16 FILL CONSTRUCTION UPDATE AND CERTIFICATION <br />On March 18, 1994 I accompanied Mr. James A. Kiger, Colowyo's reclamation <br />supervisor, on an inspection of the Sec[ion 16 Fill and interviewed Mr. Kiger about his <br />observations during it's construction. The purpose of this visit was to observe the condition of <br />the fill and to satisfy the requirements of CDMG Rule 4.09.1(11). Since the last inspection on <br />December 8, 1993 very little construction has taken place. A small amount of spoil remains to <br />be placed at the extreme upper end of the fill and sloped. Other than that, the fill is essentially <br />complete. <br />During the inspection, we observed that the rip-rap in the drainage channel that <br />had been bedded with smaller material was in good condition. <br />The small seep noted in prior inspections on the extreme east end of the fill was <br />not evident. <br />The fill exhibited no appearances of instability, structural weakness, or other <br />hazardous conditions. <br />I am a mining engineer, registered in the State of Colorado, and experienced in <br />the construction of earth and rock fill embankments. Mr. ICiger is employed by Colowyo as a <br />reclamation supervisor and he personally observed the construction of the Section 16 Fill and <br />particularly the topsoil placement and seeding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.