Laserfiche WebLink
• <br />1999 Annual Hydrology Report <br />Baseline Inlormalion for Point P1002 is derived from events beginning in 1 010 111 9 9 1 through 09!20/1993. A period of -24 months. <br />Baseline Flow 0.6 g.p.m. <br />Baseline Conductivity 126 umhos/cm <br />so.oo <br />80.00 <br />70.00 <br />60.00 <br />c9 50.00 <br />0 <br />LL 40.00 <br />30.00 <br />20.00 <br />10.00 <br />0.00 <br />N N N N M r+1 r7 r7 C ~ V V ~ ~ N N W W W W n ~ r- r W W W m m ~ rn rn <br />T Or Or m Or Or ~ O) T ~ ~ T dt Of ~ m O) O) pr O) O> O) pr ~ 0) O> OI ~ O) W pr ~ O) <br />8 ~ ~ ~ 8 ~ 2 ~ 8 `~ ~ ~ 8 ~ $ ~ o ~ $ ~ 8 ~ $ ~ ~ ~ 2 ~ 8 ~ $ ~ 8 <br />Date <br />Flow - - - -Conductivity - -Linear (Conductivity) - - -Linear (Flow) <br />Plot of Flow and Conductivity <br /> <br /> r <br /> r <br /> <br /> ' <br /> ~ <br /> <br /> r <br /> <br /> <br /> <br /> r~ '~ <br /> <br /> <br /> r r <br />. r <br /> ` <br /> ~ <br /> ~ ~ ~ ~ r ti ~ r - ` _ <br /> r <br />` r <br /> - - r - <br />` Y <br /> ~ •~ <br /> ~1 <br />~ - <br />600 <br />500 <br />400 v <br />N <br />O <br />300 ~, <br />.~ <br />v <br />200 0 <br />U <br />' 100 <br />O <br />P1002 East Roatcap Creek -Pond 10-2 Monitoring Point Chart 6 <br />