Laserfiche WebLink
ANNUAL RECLAMATION REPORT <br />MESA GRAVEL PIT <br />SENECA COAL COMPANY <br />PERMIT NO. M-1982-036 <br />INTRODUCTION <br />The gravel from this operation is used at Seneca Coal Company's mining operations for road construction <br />and road maintenance. During this reporting period Qune 1, 2006 to June 1, 2007), approximately 19,000 <br />tons of gravel were produced. With the approval of Technical Revision No. 02 Qune 1998), the permitted <br />acreage for this property is 96.5 acres. <br />Z Location and Number ofAcres A6'ected During this Reporting Period. <br />The Mesa Gravel Pit 2006-07 Annual Reclamation Map shows the status of mining and reclamation <br />activities as of June 1, 2007. <br />There was no additional surface disturbance during the 2006-07 reporting period. <br />Z. Location and Number ofAcres Reclaimed During this Repoting Period. <br />The number of acres is various stages of reclamation (backfilled, graded, topsoil replaced, and seeded) <br />is listed below and locations are shown on the 2006-07 Annual Reclamation Map. <br />Activi 2006-07 acres Cumulative aces <br />Backfilled (only) 0.0 0.0 <br />Graded 0.0 34.7 <br />Topsoil Replaced 0.0 32.7 <br />Seeded 0.0 32.7 <br />3. Location and Number ofAcres m the Topsoil Replacement Stage <br />All acres previously topsorled have been seeded. See the above compilation of acreages. <br />4. Average Thiclaaess of Topsoil Replaced <br />There was no topsoil replaced during the 2006-07 reporting period. However, past topsoil replacement <br />has averaged 12 inches. <br />5. Location and Number afAcres Seeded <br />There was no seeding conducted during the 2006-07 reporting period. <br />6. The Species of Yegetadon Planted, The Seeding Rate and Approximate Dates ofSeeding <br />The seed mix used at the Mesa Gravel Pit consiszs o$ <br />Ranger alfalfa S lb/ac <br />Big Blue Stem grass 1 lb/ac <br />Seed Oats 10 lb/ac <br />