Laserfiche WebLink
<br /> <br />y~ <br />x <br />1 <br />3 <br />t <br />1 <br />The anchor trench was filled following completion of the liner installation. The access road around <br />the pond perimeter was graded and a chain link fence was installed. Riprap was placed in the spillway <br />plunge pool. Final inspection and approval was accepted by Colorado River Engineering on March 27, 2000. <br />Conclusion <br />_ The constnrcdon of the retention pond was completed to the lines and grades shown on the design <br />drawings. The embanlatrent and subgrade earthwork were found acceptable. The impermeable HDPE pond <br />liner has been inspected and was found to be free from defects. It is our opinion that the storm retention will <br />safely stove and retain storm runoff water. <br />If you have any questions, please do not hesitate to ca11970-625.-4933. <br />Sincerely, /nom <br />i~ ~"VL <br />Christopher Manes, P.E. <br />CM:cm <br />Enci: <br />CC: Kvaemer, Ed Hudock <br />UppaPond.dac <br />3 <br />