Laserfiche WebLink
Frequency Over what period <br /> c. Watering <br /> V. Evaluation of success <br /> a. What areas need additional backfilling? <br /> b. TAbat areas need additional shaping? <br /> c. What areas need additional planting? <br /> VI. Plan for the following year <br /> Permit Previous Report <br /> a. Mining Current plan Specification Projection <br /> 1. # Acres to be 5 Acres <br /> stripped <br /> Locations Part of Stage 1 <br /> 2. # Acres to be <br /> excavated 5 Acres <br /> Locations Stockpile Area <br /> b. Reclamation <br /> 1. 1 Acres to be 5 Acres <br /> backfilled <br /> Locations <br /> iP <br /> 2. S Acres to be Completion of the y <br /> graded West & NW sides of <br /> Locations Stage 1. Grade slopes <br /> to lake & revegetate <br />