Laserfiche WebLink
BRIERLEY September 28, 2006 ~~~`~~~~~D <br />ASSOCIATES File No. 00036-002 <br />~,m,ted ~,ae,,,~r ~ompa~y SEP 2 8 2006 <br /> Division of Reclamation, Mining & Safety Division of Reclamation <br /> <br />"Creating Space Underground" <br />1313 Sherman Street , <br />Mining and Safety <br /> Room 215 <br /> Denver, CO 80203 <br /> Attention: Mr. Berhan Keffelew <br /> Subject: DRMS Permit No. M-1987-049 - 2006 Annual Report <br /> Ready Mixed Aggregates <br /> Bromley Lakes Pit <br /> Brighton, Colorado <br />Dear Mr. Keffelew: <br />Brierley Associates, LLC, is pleased to submit this DRMS Annual Report <br />transmittal on behalf of Ready Mixed Aggregates (RMA) for the referenced <br />Bromley Lakes Pit facility. Enclosed with this cover letter summarizing site <br />activities during the yeaz ending September 29, 2006, are: (1) a signed DMG <br />"ANNUAL FEE and REPORT REQUEST" form; (2) a check from RMA for <br />$688.00 for the annual fee due on or before September 29, 2006; (3) a map <br />depicting general site conditions for the reporting year; and (4) an air photograph <br />reproduction at the same approximate scale as the map showing June 2006 <br />conditions for your reference. We have included both the map and air photo in <br />11"x17" format for convenience. We would be happy to also provide them in <br />22"x34" format if desired. <br />During the report yeaz mining activity occurred within Phases 8 and 9 as per <br />Exhibit D-1, Revised Mining Plan Map in Technical Revision TR-002 of the <br />permit, and as shown on the attached Annual Report Map. Other site activities <br />and improvements included (1) stripping and stockpiling oftopsoil and <br />overburden from within Phase 9 and within a small portion of Phase 11; (2) initial <br />reclamation backfilling of the west and south sides of Cell No. 2 (Phases 7 and 8 <br />from west to east); and processing and removal of old recycled concrete <br />stockpiles formerly located in the northern portion of Phase 9. Phase 3B remains <br />an active fresh/sedimentation pond area. <br />Mining activities at the site occurred within the two phase areas noted above. <br />z3z9 w Main street Disturbance consisted of the approximately 28.7 acres where mining was <br />suite zo I expanded compared to the prior reporting year. Gross production for the year was <br />uttleton, co ao 12o approximately 1,000,000 tons. Proposed new mining disturbance for the coming <br />303.703.1405 <br />fax 303.703.1404 <br />www.brierleyassociatescom <br />