Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />999 <br /> <br />RECEIVED <br />MAY 121991 <br />Jiviign or mmerais & Geology <br />May ,~:~, 1997 <br />Mr. Jim Dillie <br />Divisial of Minerals and Geology <br />1313 S1lz rman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />Df4G Permit No. M-88-112, TR-010 <br />Wtelcl f _ond Cu.nr l ia:t_e .~eporr <br />Play 04 - May ,1G 1997 <br />Dear Mr. Dillie: <br />Attached is a summary of the on-site cyanide analysis performed on <br />samp'_es from the tailings pond and the collection pond during the wt :ti <br />of play 0-1 - May 10, 1997 as required by the approved TR-010. <br />During the •deek, th_ taillings pond a'ieraged 0.12 ppm CN-wad aired 0.2? ppm <br />CN-total. The collection pond averaged 0.13 ppm CN-wad ar!d 0.30 pp~~ C?v- <br />total. <br />//S\~incerely, <br />Ron~Zu alr~~~~ <br />cc: Anne Baldrige <br />Dan Robertson <br />