My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP08259
DRMS
>
Back File Migration
>
Report
>
REP08259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:11 PM
Creation date
11/26/2007 11:51:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Report
Doc Date
2/18/2003
Doc Name
Submittal of Undesirable Event Report
From
White River Nahcolite Minerals
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPORT OF UNDESIRABLE EVENT <br />DATE/TIME OCCURRED 2/9/03 1500 DATE /I1ME REPORTED BLM: 2/10/03 <br />LOCATION: SEl/4, NWl/4 QTR QTR, SEC. 26 T. /S R. 98W 6TH Meridian <br />County: Rio Blanco State: Colorado <br />WELL/FACILITY NUMBER: OPERATOR: White River Nahcolite <br />SURFACE OWNERSHIP: Federal Indian Fee State <br />LEASE NUMBER: C-0118327 UNIT NAME/CA NUMBER: <br />TYPE OF EVENT: Blow out Fire Fatality Injury Property Damage <br />Oil Spill Saltwater Spill Toxic Fluid Spill Gas Venting <br />OiUSaltwater Spill OiUToxic Fluid Spill <br />Other (specifyLBicazb Water <br />CAUSE OF EVENT <br />VOLUMES OF POLLUTANTS: Dischazged/consumed: 200 barrels <br />Recovered: 200 barrels <br />TIME REQUIRED TO CONTROL EVENT (in hours 6 hours <br />ACTION TAKEN TO CONTROL EVENT, DESCRIPTION OF DAMAGE, CLEAN UP PROCEDURES <br />AND DATES: A water truck was utilized to remove all standing water from the erosion basin to <br />the process pond. A backhoe was utilized to remove (to bedrock) all sediment from the basin <br />to a mud pit at SH well. <br />CAUSE AND EX'T'ENT OF PERSONNEL INJURY: None <br />OTI~R FEDERAL, STATE AND LOCAL GOVERNMENT AGENCIES NOTIFIED: Colorado Division <br />of Minerals and Geoloev <br />ACTION TAKEN TO PREVENT RECURRENCE: Operations have been notified to properly <br />maintain discharge pipe to avoid plugging problems. During future boil-outs, especially during <br />initial stage, discharge line manholes will be routinely inspected. <br />GENERAL REMARKS: <br />RECEIVED BY: <br />Ed Baker <br />W1tN Envir/Safety Manager <br />(name)/ (title) <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.