ANNUa~L REPORT
<br />INSTT:UCTIONS
<br />.Accordins to C.R.S. 34-33-1 l f,(3~, and C;R.S.-3g; 325-1,16(3)(a). on the anniversary dale of the permit each year,
<br />[he operator shall submit a repoel and a map showing the extent of current disturbances to affected land.
<br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur
<br />during the upcoming year, and reciama[ior4'tf4at J6ilI he petR-ormed during the upcoming year. Please attach such
<br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes
<br />the above elements may suffice far a written report.)
<br />IF your operation is subject [o the provisions of Temporary Cessation as defined in the Act and Rules, you must
<br />provide with the Annual Repor the followins information as required by 2 CCR 407-1, 407-4, and Rules
<br />1. l 3.7(1)(x): y
<br />(i) the condition of tht: operation at the time of cessation:
<br />(ii) whaC specific measures have been and will be implemented to comply with reclamation, performance
<br />standards and Environmental Protection Plan requirements, if [hey are part of your approved application; and
<br />(iiij plans for resumption of mining operations.
<br />Please provide the additional following information wtth your Annual Report, as applicable:
<br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.1(1), provide an updated statement
<br />regarding the sufficiency of the value of the Financial Warranty, specifically:
<br />(ij Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.1 ~(I)(a), provide an updated
<br />statenfent regarding the sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letu:rs of credit, Deeds of'Irust, and security agreements, self-insurance, salvaee
<br />credit, and first priority liens on projet:t related fixtures.
<br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), pemtits secured with a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property value, and a statement summarizing
<br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement,
<br />and the value of the property subject to either of these instruments. The report shall also provide
<br />_ eroof that there are no past-due property_taxes~- _ _ _ - ___ . _ _ _ _ . _. - _--. - _--
<br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form
<br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of
<br />Credit does not exceed [en percent (1090) of the bank's capital surplus accounts.
<br />(ii) Per the requirements of 2 CCR 40'7-l, 407-4, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient
<br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment.
<br />(b) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1)(c), all monitoring information
<br />required as part of the approved permit application, to include the Environmental Protection Plan. (Please
<br />note that if you are no[ a Designated Mining Operation, you will not have an Environmental Protecton
<br />Plan as part of your approved permit.)
<br />
|