Laserfiche WebLink
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />7 713 Sherman 51.. Room 215 <br />Denver, CO 8U?03 <br />Phone: 13031 R66-7567 <br />F,~x: 13031 83 2-81 06 <br />April 26, 1993 <br />Mr. John 0. Buckner <br />2516 Waldean Street <br />Colorado Springs, CO 80909 <br />Re: M-93-030, Crystaljack Mine, Permit Issuance <br />Dear Mr. Buckner: <br /> ti`~~~~4 <br />~~ <br /> 1.~ . <br />MAR 0 2 1995 ~ ems <br /> Rnv Hnmer <br /> <br />Division of mules ass a ueuwyy cn„~m,~~ <br /> ,,~~naei e Lnn~; <br /> Dir is inn r~RaUnr <br />On April 26, 1993, the Division of Minerals and Geology found John 0. Buckner <br />to have satisfied the applicable requirements of C.R.S. 34-32-101 et sec. for <br />obtaining a mining and reclamation permit. Therefore, a permit is being <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and Supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, April 26, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />5225.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for <br />112 Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the <br />specific annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sinc r 1 <br />J <br />MICHAEL B. L <br />Division Director <br />MBL/WCY/ern <br />Enclosure 3349G <br />