My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP08049
DRMS
>
Back File Migration
>
Report
>
REP08049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:02 PM
Creation date
11/26/2007 11:48:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Report
Doc Date
9/3/1985
Doc Name
986
From
SNOWMASS COAL CO
To
MLR
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAP ~ ~°~~ <br />tv11NEU LAND <br />RECLAMATION DI~ISI0~1 <br />REFUSE DISPOSAL SITE CHECK SHEET <br />TTFM Vcc vn <br />COPIHENTS <br /> Waste material from pond and <br />" site led u has n t been <br />~ <br />g <br />a <br />lavers <br />1. Coal refuse de osited in 24 X moacte <br />. <br />n <br />c <br /> Refuse pile has been inactive <br />2. Each layer is compacted to at least n/a except as noted above. <br />907. maximum dr densit <br />3. V-Dicch D-9 instalied New road is not installed yet, <br />a. slope X therefore permanent ditch not <br />b. Ditch linin Material installed. _ _ _ _ _ <br />4. V-Ditch D-10 installed. <br />a. Slope X variable X <br />b. Ditch lining Material 8 Pit RUn <br />5. Height of refuse material since last <br />bench (If 40' CO\STRUCT BE~CH1) 25 ft. <br />6. Bench being constructed. __ NOt being Constructed. _ _ <br />7. Refuse material outslope is 240 or X Le55 than 24° <br />1V: 2~ H Tfaximun ____ <br /> - enc s <br /> X Bench #1 & #2 are 20' wide. <br />8. Bench width is 20 feet <br />9. Bench slope is back towards refuse pile at X BenC.h #i and #2 <br />1V: 20 H Minimum. _ <br /> Bench #1 & #2 drain to D-10 but <br />10. Benches are pitched towards either side to X Will slope both d'IreCt10n5 When <br />divert runof <br />f <br />to ditch D-9 or D-10. r0dd i5 filled. (see below) <br />- <br />_ <br />_ <br />_ Lift #1 & on y. 1 as x <br />11. Completed outslopes and benches are covered temporary COVer Wh1Ch 1S less <br />with at least 4' of nontoxic, noncombustible k than four feet thick. <br />material includin an ade uate to soil laver. <br />12. Evidence of anv structural defects.* X * If ves see coimnen[s below <br />13. Topsoil from previously undisturbed areas X Not applicable for inactive <br />bean salva ed ade vately. pile. <br />14. Trash and other debris being separted X NOt applicable for 1naCtlVe <br />from coal refuse. pile. <br />I5. Additional comments or observations <br />10. (continued) Bench #3 has been regraded so that water will flow towards <br />D-10 until D-9 is constructed. <br />I hereby certify that the inspection of <br />direct supervision and is constructed as per <br />Permit requirements. - --- <br />Date ~iqusT' 21v, /985 <br />the refuse disposal area was done undes m~• <br />the current Colorado Mined'La'rid~Reclamation <br />n <br />- _ _ n•_. _ <br />47 ~'° J 4 <br />~: ~ (t ~:) <br />~~ Q <br />Signature J y e <br />0 <br />e ~ r <br />~~' •a•`oacaeo`~~\0~ <br />V arntlO• <br />
The URL can be used to link to this page
Your browser does not support the video tag.