Laserfiche WebLink
• 2000 Annual Hydrologic Report <br />Page 3 <br />diameter pipe is presented on permit Figure 14-6. The capacity of this discharge pipe is <br />about 75 gpm. Data page SD-14 presents the results of weekly monitoring on Outfall 001. <br />The 2000 full suite water analysis results are shown on data page SN-7. <br />Discharge point 002 is water siphoned from the reclaimed Northwest Intake Portal at the <br />Roadside South Portals. Mine inflows that were not pumped to the preparation plant were <br />routed to an abandoned portion of the mine for discharge from this point. The preparation <br />plant was shut down during December 1999 so all mine inflows in excess of those handled <br />by outfall 001, flow north to the lower portion of the mine where they are handled by the <br />siphon, outfall 002. Data page SE-9 presents a listing of water quality monitoring <br />performed at this site during the Year. Data page SO-7 includes a full suite analysis <br />performed on a sample collected during 2000. The average TDS was about the same as <br />last year. The following table presents the average TDS measurements for outfall 002 for <br />the last four water years. <br />Average TDS from Pages SE-6 -~ SE-9 <br />Water Year 1997 1998 1999 2000 <br />TDS (mg/I) 1683 1674 1558 1560 <br />Discharge point 004, discharge from the Roadside North Portal, only had flow through <br />December 15, 1999. It is unlikely this discharge point will have any further discharge <br />since the North Portal was sealed on February 10, 2000. A listing of weekly monitoring <br />results is given on data page SF-18. No full suite analysis on outfall 004 was performed <br />this year since there was only discharge during the period October, November and <br />December 1999. <br />Whole Effluent Toxicity (WET) tests were continued this Year. The acute test involves <br />subjecting fathead minnows to various dilutions of effluent in receiving water for 4 days <br />and subjecting Ceriodaphnia dubia to various dilutions for 2 days. The tests look <br />primarily at mortality during the test period. Data pages SL-3 and SM-3 include <br />summaries of the percent survival at the individual effluent dilution ratios for the Year. <br />Discharge from outfall 001 and 002 are combined proportional to the total discharge for <br />the previous month to form one sample. The survival rates for all samples taken this <br />Year were in compliance with the discharge permit requirements. <br />