Laserfiche WebLink
Basilil Resources, Inc. <br />Quarterly Inspection Report <br />Coal Waste Banks <br />Rulcs 4.09(1 l) and 4.10 (2)(2) <br />^ Goldm Eagle -Exhibit 17, pages 2.05-19, 2.05-25(a) through (c) <br />Qj New Elk -Exhibit 30, page 2.05-27 through 2.05-04 <br />Activity During Inspation: /(~~~ <br />^ Removal of Topsoil or Qrgansc Maher <br />^ Installation of Surface Drainage Systems <br />^ Placemcat of Underdrain(s)• <br />^ Revegctation ^ Construaion of Fill <br />Drainage: Include discussion of springs, overland and tdtamel flow, ~~~tn construction a~/or discharge, <br />inugrity of 100-year 24hour appurtenant drainage sttvatua, evidence of positive drainage. <br />a _ <br />~~~" ~ ~~ <br />h~ <br />~~~ ~~ <br />~-~ n,~ <br />r ~ /{ ,7 ~ <br />~~~~ ~- Y % ' "MVO`(/'//-',1 <br />rfio v ~ s ,~-G-'f~ s ~ y~ ~ ~ SG'~-r'r~' a s ~~ ~~ <br />Observations of Fill Construction: Include description of material, c`otnpaaion, lift tlridmesscs, slopes of sides <br />and faces, construtxion methodology. <br />~~ ~ N~ / J <br />~~ ~~ ~ ~ ~ G ~ ~~ ~. <br />P,~e 1 or z <br />Grneral Descrlptioo or Refu-ence to Slte Plan: <br />