Laserfiche WebLink
Mr. Tom Augustine - 2 - April 7, 1989 <br />In summary, the following changes are required: <br />At New Elk, <br />- Upgrade ditch D2 design to Type C. <br />- Construct/repair ditches D2, D3, and D4 to meet design. <br />At Golden Eagle, <br />-Extend North and South ditches around west end of pile. <br />According to the permit stipulations on-the-ground changes must be made within <br />90 days of permit issuance (January 25, 1989), or by April 24, 1989. Please <br />contact me or Tony Waldron if you have questions concerning the ditch designs <br />or physical changes. <br />Sincerely, <br />William B. Crick <br />Reclamation Specialist <br />WBC/1 ac <br />cc: Jim Stevens <br />Tony Waldron <br />5044E <br />