Laserfiche WebLink
iiiiiiiiiia---i-ii <br />Notice of Intent to Continue Mining Operations sss <br />.r 112 Annual Report <br />Permittee Name: Colorado Lien Company, a division of Pete Lien 8t~rt¢,.lnc. <br />Permit Number: M-77-304 __wcc//~/~D <br />Operation Name: Rex Quarry -Sec 36 ~Cj 2 <br />Anniversary Date: 09/24/94 D;y;s. 8 19g~ <br />Total $550.00 (Due on your anniversary date°o/~y;cera~s& Gep% <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? aF€S X10 <br />Does this mine operate MORE or LESS than 180 days per year? MORE 6€SS <br />2. Does this mine have a phased reclamation plan? YES A1C3 <br />3. Permitted acreage: 109.8 <br />4. Total acres affected during the report year: * 0 <br />5. Total acres reclaimed for the report year:* 0 <br />6. Total acres in various stages of reclamation: <br />a. Backfilled: 4.9 d. Topsoil replaced: 4.9 <br />b. Graded: 4.9 Average topsoil <br />c. Seeded: 4.9 thickness replaced: 6 inches <br />List species seeded 8 seeding rate for report year on back. SEE SEPARATE REPORT. <br />7. The type and approximate quantity of fertilizers, organic material or soil conditioners used for the report year: <br />8. Estimated total acres to be affected in the next report year: 0 <br />9. COMMENTS: <br />Permit revised on 2 MAY 94 for asphalt plant. All disturbance this year was in previously disturbed <br />areas. Areas in various stages of reclamation include 4.4 acres initiated in previous years and 0.5 <br />acres begun this year. No reclaimed areas have been released by DMG. <br />Please show the location of the acreage for items 46 on your map". Indicate the phases of the reclamation which <br />have been completed, correlated with your timetable. <br />'* NOTE: If there have not been any changes since the last annual report and you previously submitted a map <br />which correctly depicts the current acreage in itmes 2 through 6, then a new map is unnecessary. However, this must be <br />stated above. <br />Signature: ~ - Date: ~ ~p9~ <br />Please type or print the current contact name, mailing address, and phone number below: <br />IN COLORADO: ENVIRONMENTAL: LEGAL: <br />Sid Beck, Quarry Superintendent Nathan A. Barton, P.E., Environmental Craig Grotenhouse, Esq., General <br />and Permitting Compliance Engineer Counsel <br />Colorado Lien Company Pete Lien 8 Sons, Inc. Pete Lien 8 Sons, Inc. <br />P.O. Box 1961 P.O. Box 767 P.O. Box 440 <br />Fort Collins, CO 80225-1961 Rapid City, SD 57709-0767 Rapid City, SD 57709-0440 <br />(303) 493-6294 (605) 342-7224 (605) 342-7224 <br />Federal Tax ID No. or Social Security No. <br /> <br />