Laserfiche WebLink
L' <br />' 2.2 Hydrologic Monitoring Schedule <br /> <br /> <br /> <br />II <br />II <br />II <br />S[a[ion Frequency Elevation Location Water Twe <br />H-1 Note 1 6100 Hubbard Creek Surface Water <br />H-10 Note 2 6376 Hubbard Creek Ground Water <br />B-6 Note 2 6782 Bear Creek Ground Water <br />S-1 Note 5 6080 Sanborn Creek Surface Water <br />S-2 Note 5 6030 Sanborn Creek Surface Water <br />P-1 Note 5 6057 Portal Drop Inlet Surface Water <br />U-1 Note 5 6090 Unnamed Drainage Surface Water <br />C-1 Note 5 6070 Coal Gulch Surface Water <br />NF-1 Note 4 6080 N. Fk. Gunnison River Surface Water <br />NF-2 Note 4 6010 N. Fk. Gunnison River Surface Water <br />NF-3 Note 4 5910 N. Fk. Gunnison River Surface Water <br />SC-1 Note 3 6106.1 Drill hole Ground Water <br />SC-2 Note 3 6227.8 Drill hole Ground Water <br />SC-3 Note 3 6227.8 Drill hole Ground Water <br />SP-1-6 Note 6 8000-8200 Spring Surface Water <br />SP-7-11 Note 7 b100-6200 Spring Surface Water <br />AG-1 Note 5 6185 "A" Gulch Surface Water <br />BG-1 Note 5 6200 "B" Gulch Surface Water <br />CG-1 Note 5 6190 "C" Gulch Surface Water <br />HN-1 Note 5 6200 Hawksnest Creek Surface Water <br />HG-1 Note 5 6200 Hoopla Gulch Surface Water <br />BC-1 Note 5 6240 Bazdine Canyon Surface Water <br />T-1 Note 5 6220 Thompson Creek Surface Water <br />WSC DH-12 Note 8 7553 Coal Gulch Ground Water <br />Outfa11011 Note 9 6060 Sanborn Creek Mine Water <br />TC-1 Note 3 6220 Drill hole Ground Water <br />TC-2 Note 3 6220 Drill hole Ground Water <br />NOTES: <br />1. April, June, August & October field pazameters, full suite April & October. <br />2. April field pazameters, October field pazameters & full suite. <br />3. Quarterly field pazameters, semi-annual full suite. <br />4. Quarterly field pazameters and full suite. <br />5. Monthly field pazameters, quarterly full suite. <br />6. Monthly field pazameters April through October through June 1994 then re-commence <br />one yeaz prior to and continue two yeazs after retreat mining. <br />7. Monthly field parameters through June 1994. Monthly flow thereafter. Re-commence <br />monthly field pazameters one yeaz prior to and continue two years after retreat mining. <br />8. Annually in June field parameters and full suite. <br />9. CDPS requirements with flow meter, quarterly full suite. <br />7 <br />