Laserfiche WebLink
Table la. Trapper Mine 1985 Quarterly Groundwater Sampling Dates for Field Parameters Listed in Table 1. <br />QUARTER <br />1ST 2ND 3RD 1) 4TH <br />GB-1 3/6 6/5 8/21 and 9/16 I1/25 <br />GZ-3 3/6 6/5 8/21 and 9/17 11/25 <br />GA-1 3/30 6/19 8/21 and 9/17 12/6 <br />2 3/30 6/19 8/21 and 9%17 12/6 <br />GB-2 3/30 6/20 8/21 and 9/17 12/6 <br />5 3/30 6/20 8/21 and 9%17 12/6 <br />GBB-1 3/7 6/l0 8 20, 8/21 and 9/19 11/21 <br />GBB-2 <br />GBB-3 3/7 <br />3/7 6/10 <br />6/10 8/21 <br />9/19 and 9/19 11/22 <br />11/22 <br />GC-1 3/25 6/11 9/23 11/26 <br />3 3/25 6/11 9/23 11/26 <br />GD-1 3/'29 6/20 9/11 12/4 <br />GE-1 3/29 6/26 9/18 12/12 <br />2 3/29 6/25 9/18 12/12 <br />3 3/29 6/25 9/18 12/5 <br />GF-1 3/27 6/5 9/11 and 9/16 11/26 <br />2 3/27 6/5 9/17 12/2 <br />3 3/27 6/5 9/20 11/26 <br />GZ-1 3/6 6/5 8/2! 11/25 <br />2 3/30 6/13 8/21 and 9/17 11/25 <br />P-1 3/28 6/4 9/20 11/27 <br />3 3/28 6/4 9/20 11/27 <br />5 3/28 6/18 9/17 11/27 <br />8 3/28 6/4 9/16 11/27 <br />J-1 3/27 6/4 9/19 11/27 <br />Goy AVF 3/25 6/11 9/25 10/23 <br />(1) During the 3rd quarter, several sites were monitored more than office. Those dates (underlined) are Che <br />days the field parameters and lab analysis data were taken. <br />WSH/jb <br />1/86 <br />