Laserfiche WebLink
<br />Page 7 of 7 <br />Table 3. Trapper Mine 1985 Annual Groundwater Monitoring Summary based on Parameter <br />List B (Table 4.8-12) Erom Trapper's OSM Permit Application. (1) <br />(1) OSM Permit Application as submitted January 1981 and revised through Adequacy <br />Responses 1-12 (July 28, 1982). <br />(2) Parameters are expressed in milligrams per litter (mg/1) unless otherwise <br />footnoted. <br />(3) T = Total; D = Dissolved concentrations. <br />(4) Expressed in SAR units. <br />(5) Expressed as pCi/1 at a 95% confidence interval. <br />(6) Radiinn samples were not taken with the rest of sample. R226 for GB-5 was 9/17/85. <br />8226 for GBB-2 was 9/19/85. <br />(7) Multiple full parameter sampling daces. The extra analysis are appended to Table <br />3 after site GF-5. <br />(8) Unable to obtain samples. Soundings indicate a dry well. <br />(9) Samples taken wiCh pumping contract but not required. <br />(10) Not required. <br />WSH/jb <br />1/86 <br /> <br />