My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP07734
DRMS
>
Back File Migration
>
Report
>
REP07734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:37:50 PM
Creation date
11/26/2007 11:43:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
Report
Doc Date
9/2/1978
Doc Name
ANNUAL REPORT MLR 77-129 WHITEWATER BLDG MATERIALS CORP WHITEWATER PIT 500 MESA CNTY
From
WHITEWATER BUILDING MATERIALS CORP
To
MLRB
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br />e <br />I <br /> <br />e <br />SAND &~ GRAVL'L <br />PRODUCTS' <br />September 2, 1978 <br /> <br />WHITEWATER-BUILDING MATERIALS CORPORATION <br />Phoae 242-4843 or E42•J537 P. O. Boz 1769 <br />940 SontL lOt6 Street <br />GBAXD JUNCTION, COLORADO 81501 <br />Mined Land Reclamation Board <br />1313 Sherman Street, Room 723 <br />Denver, Colorado 80203 <br />Gentlemen: <br />V <br />Re: Annual Report - MLR File No. 77-129 <br />Whitewater Building Materials Corporation <br />Whitewater Pit 500 - Mesa County <br />Mining and reclamation are proceeding on schedule in accordance with the mining and <br />reclamation plans and time tables in the original application. <br />Reference is made to MLRB Rules and Regulations, amended December 1977, Section 2.40: <br />2.41 (I) (a) Mining operations in Stage 0, 1974-1977, were completed as <br />scheduled. Approximately 7.45+ acres were affected as planned <br />(see map D-1 or D-lA). <br />(b) Operations in Stage X, 1975-1980, were completed ahead of <br />schedule. Approximately 10.75+ acres were affected as <br />planned (see map D-1 or D-lA). <br />(c) Mining operations in Stage I, 1978-1981, are continuing as <br />planned. We have affected approximately 5.30 acres this year <br />(see map D-1 or D-lA). <br />(d) Mining operations in Stage A, 1977-1981, are continuing as <br />planned. We have affected approximately 1.25+ acres this <br />year (see map D-1 or D-lA). <br />s <br />(2) (a) Reclamation Phase 0, 1978-1982, is in the process of regrading <br />and sloping as prescribed. Planaed revegetation will not be <br />carried out until the fall of 1979 because regrading and sloping <br />will continue into at least mid-winter of this year. <br />(b) Reclamation Phase X, 1981-1985, is ahead of schedule with regrading <br />and shaping complete. Road graveling will occur this fall, and <br />it is hoped that the planned revegetation will be possible during <br />the 1978 fall planting season. <br />(c) Phase I - no reclamation scheduled until 1982. <br />(d) Phase A - no reclamation scheduled until 1982. <br />READY MIXCD <br />CONCRETE <br />
The URL can be used to link to this page
Your browser does not support the video tag.