Laserfiche WebLink
<br />.' <br />,~M,,~y 999 <br />~d(~ r~l~ Basin Resources, Inc. <br />~- Quarterly Inspection Report <br />P,le ~"~~ Coal Waste Banks <br />Rules 4.09(11) and 4.10 (2)(2) <br />Mine: Qjeu) ~~~ <br />Date: y) u HP Zl - l J `16 <br />Waste Bank No:. i~l__fM__L~t~ t-u_SS~ ~/~~~1 /ot 11 ' <br />General Description or Reference to Site Plao: i p~ <br />^ Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25(a) through (c) <br />~ New Elk -Exhibit 30, pages 2.05-27 through 2.05134 <br />Activity During Itupectioo: /D~ F <br />^ Removal of Topsoil or Organic Matter <br />a <br />^ Installazion of Surface Drainage Systems <br />^ Placement of Underdrain(s)• <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction and/or discharge, <br />integrity of I00-year 24-hour appurtenant drainage structures, evidrnce of positive drainage. <br />f~rtryre~e.~ eQrtatrrt~.¢, /Yt~-rrr~4rNeo~, ~J <br />/~eri w~~~1 cPrat.~OOo-~ oP/~/s/A.` ~i.I~tccS ma~n~rH~. <br />~„~rAP~a~„z e~~ ,rba.~0 r'e~~ a„~C .rut~^1`","P.~ <br />N~ I/~ S/~y~- s/qrr S d~ JPrtrr~s {h"v~jlza/~S' <br />Observations of Fill CotsstructioA: Include description of material, compaction, lift thicknesses, slopes of sides <br />and faces, construction methpdology. <br /> <br />If qL~~l-trrl <br />/ •"- <br />Page l of 2 <br />