ANNUAL REPORT • ..
<br />INSTRUCTIONS
<br />Accordins to C.R.S. 34-3?-I 16(3), and C.R.S. 34-32.E-I 16(3)(a), on the anniversary date of the permit each year,
<br />the operator shall submit a report and a map showing the extent of current disturbances to affected land.
<br />recl:unation accomplished to date and durin_ the precedine year, new disturbances that are anticipated to occur
<br />durin, the upcoming year, and reclamation that will be performed Burins the up~.oming year. Please attach such
<br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes
<br />the above elements may suffice for a written report.)
<br />[F your operation is su~ect to the provisions of Temporary Cessation as defined in [he Act and Rules, you must
<br />provide 'vi[h the P,nntial-Report the following information as required by 2 CCF'. 407-1, 407-4, and Rules
<br />(i) the condition of the operation at [he time of cessation;
<br />(ii) what specific measures have been and will be implemented to comt~ly with reclamation, performance
<br />standards and Environmental Protection Plan requirements, if they are pan of your approved application; and
<br />(iii) plans for resumption of mining operations.
<br />Please provide the: additional following information with your Annual Report, as applicable:
<br />(a) Per ttie requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement
<br />regarding the sufficiency of the value of the Financial Warranty, specifically:
<br />(i) Per the requirements of Z CCR 407-1, 407-4, and Rules 1.1.~(1)(a), provide an updated
<br />statement regazding the sufficiency of the value of the financial warranty. Specifically,
<br />itTevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage
<br />credit, and first priority liens on project related fixtures.
<br />
<br />(ti) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.:! ~(l)(b), permits secured with a
<br />L)eed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property valu~:, and a statement summarizing
<br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement,
<br />_ _ and the value of the property subject to either..2f these instruments. The.repor,-shall-also provide --
<br />-` -`-- `- -" proof that there are no past-due property taxes.
<br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.'7(3), permits secured with an
<br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form
<br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of
<br />Credit does not exceed ten percent (109c) of the bank's capital surplus accounts.
<br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient
<br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment.
<br />(b) Per [tie requirements of ?CCR 407-I, 407-4, and Rules I.15(1)(c), all monitoring information
<br />required as part of the approved permit application, to include the Environmental Protection Plan. (Please
<br />note that if you are not a Designated Mining Operation, you will not have an Environmental Protection
<br />Plan as pan of your approved permit.)
<br />
|