Laserfiche WebLink
.t <br />ANNUAL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 34-33-116(3), and C.R.S. 34-32.`x-116(3)(a), on the anniversary date of the perm t each year, <br />the operator shall submi[ a report and a map showing the extent of current disturbances to affected Ian , <br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that will be: performed during the upcoming yeaz. Please tach such <br />a report and map to enclosed annual repon form. (An adequately labeled map that cleazly delineates d includes <br />the above elements may suffice for a written report.) <br />If your operntion is subject to the provisions of Temporary Cessation as defined in the Act and Rules, boa must <br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407-4, and R les <br />1.13.7(1)(a): <br />(I) the condition of the operation at the [ime of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, <br />performance standazds and Environmental Protection Plan requirements, if they are pan of y <br />approved applicadon;and <br />(iii) plans for resumption of mining operntion:c. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated star <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(1] Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.1 ~(1)(a), provide an uF <br />statement regarding the sufficiency of the value of the financial warranty. Specifics] <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits seta ed with a <br />Deed of Trust or a Security Agreeme~tt, the operator shall submit an update, by a qu 'fied <br />independent appraiser, indicating any changes in property value, and a statement su arizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security greement <br />and the value of the property subject to either of these instruments. <br />The report shall also provide proof that there are no past-due property taxes. <br />(iii) Per the requirements of Z CCR 407-1, 407, and Rules 4.7(3), permits secured ith an <br />Irrevocable Letter of Credit, the openator shall have the bank provide documentation n the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the <br />Letter of Credit does not exceed ten percent (10%) of the bank's capital surplus acco nts. <br />(vi) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secur d by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in su ficient <br />detail to fully describe the condition, value, and location of all pledged fixtures <br />and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 40"r-4, and Rules 1.1~(1)(c), all monitoring inform <br />required as part of the approved permit applit:ation, to include the Environmental Protection <br />(Please note that if you are not a Designated lvIining Operation, you will not have an Enviror <br />Protection Plan as part of your approved perntit.) <br />