Laserfiche WebLink
Groundwater Sampling Report <br />May 12, 1997 <br />Page 3 <br />directly from the pump hose during pumping. Sample labels were completed immediately <br />following sample collection and the containers closed and placed in a cooler with ice. Samples <br />were hand delivered to ACZ Laboratories Inc. in Steamboat Springs under chain of custody <br />control. A copy of the chain of custody is attached. The laboratory results of the sampling <br />will be sent to your attention and should be completed in 2 to 3 weeks. If you require <br />additional information on the sampling techniques used or the field results, let me know. <br />I enjoyed meeting you and thank you again for the opportunity to provide environmental <br />services to Blue Mountain Energy. Please let us know how we can further assist with <br />engineering or environmental projects at the Deserado Mine. <br />Sincerely, <br />TerraMatrix/Montgomery Watson <br />~ ~~~ <br />Robert J. Peterson, CPG <br />Supervising Engineer <br />RJP <br />attachments <br />FILE: J;\B)S\FLDRPT.LTR <br />