My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP07574
DRMS
>
Back File Migration
>
Report
>
REP07574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:37:44 PM
Creation date
11/26/2007 11:39:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REPORT
Doc Date
4/6/2007
Doc Name
2006 Annual Hydrology Report & Annual Reclamation Report TOC to Section 7
From
Colowyo Coal Company L.P.
To
DRMS
Annual Report Year
2006
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;~ <br />Table 1. Summary of material removed from CPDS impoundments in 2006. <br />AMOUNT OF <br />POND CLEANED OUT MATERIAL REMOVED TIME OF REMOVAL <br />Rail Loo Pond 450 c October <br />Gossard Pond 1456 cy October <br />Streeter Pond 352 cy November/December <br />Gulch A Pond 200 cy November <br />Work Area Pond 408 cy December <br />Prospect Pond 1512 c November <br />Small Impoundments/Livestock Water Tanks -During 2006, the thirteen Livestock <br />Water Tanks were inspected during the third quarter. Livestock Water Tanks are <br />being inspected on an annual basis. The impoundments did not display any signs <br />of structural weakness or otherwise hazardous conditions. <br />During 2006, Colowyo applied for and received a CDPS minimal discharge permit (No. <br />COG-600757). The purpose of this activity was to remove accumulated <br />stormwater runoff that collected in the bottom of the West Pit which contained a <br />significant stockpile of coal. A well respect company, familiar with filtering <br />• ,water to meet NPDES discharge quality standards was utilized to provide the <br />equipment and filters used to ensure compliance with applicable standards. The <br />filtered water was discharged directly into Upper Taylor Creek using a diffuser to <br />minimize erosin. The system was designed to ensure compliance with Colowyo's <br />current NPDES Discharge Standards. <br /> <br />cF i~.ia zoos <br />
The URL can be used to link to this page
Your browser does not support the video tag.